Friday 8 April 2011

moviestorm session 13

now i had done the garageband i returned to the script as Craig was doing the moviestorm work we were discussing as we went along to how we could improve the work and we had meetings to show how we were going to work this i decided to finish the script and then we would work of that and that would be the main part of the whole story

moviestorm session 12

i had already downloaded the sound to garageband and now i had to play around the sound so it would fit in the sequence well such as making the car noise fit in with the car and stop when the cars pulls up outside the cafe so all these things i had to start getting around to the next sound i had was the cafe that was more straight forward i didn't have to edit much only the end so it would cut off when the courier leaves the scene the last part was the people walking down the street again that was simple but it was picking out the parts that sounded right for the sequence but that was done in no time

moviestorm session 11

this was the first session of moviestorm of which we could start are project Craig had already started so we had a head start in Moviestorm i started to make the soundtrack for the movie we wanted just to have background sound for the project because we felt that music might just not work with the film we were trying to make i knew that garageband didn't have car sounds so i knew i would have to look online for the right sounds but the problem was that some sites dont allow you to download for free so we had to look for the site that lets you download for free i found the right site called soundjay it was very useful as it had all the right sounds i was looking for i downloaded them and put the into garageband.

Wednesday 6 April 2011

moviestorm session 10

the task was to make a schedule for the rest of the Moviestorm project so we can see what we need to do in a session we wrote down are roles for the sessions so when it came to the lesson we know what we are meant to be doing in that session and when it should be finished to be moving into the next task in the sessions the roles are split between me and Craig so now we both know what we should be doing in the session and also when it should be done by. The Moviestrom is now moving along well now with the schedule in place and making it easier and not sitting around trying to figure out what we are meant to be doing in the session for the Moviestorm project.
.

moviestorm session 8 and 9

the task was to make the storyboard and shotlists with the nine key frames already done we now had to draw all the shots that will be used in the film and then some description about what is happening in the shots. Craig drew up the shots i wrote about the descriptions and then came up with all the camera shots that was going to be used in the film. the drawings show all the characters in the set and how its going to happen. with the storyboard done i went on to make the shotlists this is were you write done all the shot numbers and then put what type of camera angle is going to be used for that shot and then a description about the shot and how its going to work.

moviestorm session 6 and 7

the task was to create the 9 key frames grid for our film the task was to draw the nine most important parts of the film and then place on the grid so when people look at the film they can get a rough idea of what the film is about me and Craig had already had the script for the film so we quickly draw them. the drawings are very basic but they show the main story line of the film we drew the pictures with actions as well showing which way the character is looking or which way they are running so we made basic drawings but with good guidance into what is happing in one of the shots of the storyboard. the picture shows are nine key frames which
represents are film